Instructions / Assembly
No Diving or Jumping. Observe all Safety Rules
1-23
GENERAL INSTRUCTIONS - YARDMORE OVAL POOLS
GROUND PREPARATION
Secon
1
f. Once these pieces are in place, screw the left and
right gussets to each other using three #10 screws.
(Image 16)
g. In order to ensure that the steel upright and the
channels are at right angles during the assembly,
push the ends of the steel upright and the channels
and tighten the bolts at the same time. First,
tighten the bolts of the channels by maintaining a
good pressure. For the screws on the steel upright
and gussets, sufficiently tighten the bolts to let the
screws exceed 1/8“. (Images 17 & 18)
C. CONT. PRE-ASSEMBLY OF THE STRAIGHT SECTION
16
17
18