Instructions / Assembly

No Diving or Jumping. Observe all Safety Rules
1-22
GENERAL INSTRUCTIONS - YARDMORE OVAL POOLS
GROUND PREPARATION
Secon
1
d. Insert the left and right gussets. the pieces are
marked "L" and "R". Ensure that the holes are
aligned. Slide the steel upright over the strap end
channel. (Image 13)
e. All holes should be lined up at this point. Use the
5/16” x 5” bolts and 5/16” nuts for the channels and
the 5/16” x 4 1/2” stainless steel bolts for connecting
the gussets to the steel uprights. Remember to
include the three-hole washers on the front side of
the gussets. (Images 14 & 15)
13
14
C. CONT. PRE-ASSEMBLY OF THE STRAIGHT SECTION
15