Put cover bracket as shown
in the figure.
Tighten up #12 Sheet Metal
Screw.
Put Resin Upper Joint as
shown in the Figure,tighten
up #12 Sheet Metal
Screws.
Hook Assembled Resin Upper Joint over the
top rail. Secure the bottm of vertical to Resin
Lower Joint by #12 Sheet Meal Screws,
Continue installing verticals in this manner
All around the pool.
Place each of the top seat over the upper joints and secure with
1
#12 Sheet
Metal Screws.
Install all of top seat in this way around entire pool.
Top seat are installed between verticals.
Each end of top seat rest on upper joint and attached to it.
It may be necessary to move the complete verticals slightly to left or right to
accommodate the top seat.
Do this carefully as not disturb the earth mound, Check all screws to be sure
they are tight.
a ) PRE-ASSEMBLING VERTICALS
b ) INSTALLING VERTICALS
c ) INSTALLING TOP SEATS
P.No.0341
P.No.0341
P.No.0341
#12 Sheet Metal Screw
#12 Sheet Metal Screw
#12 Sheet Metal Screw
P.No.0345
5mmx40 Sheet Metal Screw
ASSEMBLE Top Seat, Vertical and Cover
8RI FRAME
For 12' round and all 10' and 12' width ovals use
different screws for right and left end of the top seat as
shown figure.
End A use shorter screws. End B use longer screws.
END ; A
END ; B
3/4
40mm
Use Upper hole.