Instructions / Assembly

No Diving or Jumping. Observe all Safety Rules.
C. PREPARE THE FOUNDATION OF YOUR POOL
a.
Drive a peg into the ground at the
centre
of the area where you want
your pool.
(Image 4)
b.
Use a length of string tied between
the peg and a can of spray paint, and
mark a circle on the ground (a tape
measure can also be used). The circle
will be 8
(20
cm) bigger all round
than the pool.
(Image 5)
6
4
5
6
7
Important
Note:
Your pool must
be perfectly
levelled. Take
the time you
need to be sure
your foundation
is perfectly
levelled.
a.
Remove all sod and plants from the
circle.
(Image 6)
b.
Remove any sticks, stones and roots
from the circle using a rake.
c.
To make sure your pool is stable,
compact the ground well before
adding the sand.
1. Mark out the Area
2. Remove the sod
a.
Replace the centre peg with a flat
-
topped stake, at least 1
(25
mm)
square and 6
(15
cm) long. Drive it
down flush with the ground surface.
3. Make the Area Flat and Level
b.
Nail one end of a
straight
2-
by
-
4 (5cm x 10cm) wood plank to
the top of the stake. Use a nail long enough to hold the end of
the 2
-
by
-
4 (5cm x 10cm) wood plank to the stake while you
rotate it in a circle.
(Image 7)