Installation Guide
9
STEP 5
STEP 6
• The valve ports are labeled “RETURN”, “PUMP”, and “WASTE” with raised letters next to the openings.
• Cover the threads of each straight tting (J) with Teon
TM
tape (K) and thread one tting into each of the
1-1/2” threaded openings on the valve.
• Attach a 6’ hose (M) to the bottom of the thru-wall skimmer and to the front of the pump with (2) hose clamps
(H).
• Clamp one end of a 3’ hose (L) to the top of the pump and the other end to the threaded ttings on the
“PUMP” port of the valve.
• Attach a second 6’ hose (M) to the tting on the “RETURN” port and secure the opposite end to the tting
on the pools return with a clamp.
• “WASTE” port will accept a standard tting and a backwash hose (sold seperately) which will be used during
maintenance.
• Check the drain plug (N) at the bottom of the lter to ensure that it is screwed on tight. See Diagram 9.
ASSEMBLY INSTRUCTIONS FOR SAND FILTER (CONT.)
• Once the valve is in place, hold the clamp (D) as shown and position
the clamp around the lip of the lter and over the edge of the valve.
• The clamp should sit at around the lip of the lter tank and the
bottom edge of the valve. If it is not sitting at, the clamp will leak.
• Make sure that the screws of the clamp are lined up with the seams
of the tank. Tighten two screws on the clamp: a little at a time.
Alternating from side to side so that both sides are tightened equally.
Failure to follow these instructions will result in leaking of the clamp.
• Cover the threads of the pressure gauge (I) with Teon
TM
tape (K) and
thread into the open hole on the valve and hand tighten only.
DIAGRAM 9