663 10 Sunnen Drive St. Louis, MO 63143 telephone: 314-678-6336 fax: 314-781-2714 www.bloomfieldworldwide.com OWNERS MANUAL for SATELLITE COFFEE BREWER with ELECTRO-MECHANICAL CONTROL and EXTERNALLY HEATED SATELLITE SERVER MODEL: 9102A 9104A Includes: Installation Operation Use & Care Servicing Instructions Model 9102A Satellite Brewer with 9105SS Satellite p/n 2m-76061 Rev.
WARRANTY STATEMENT All equipment manufactured by Bloomfield is warranted against defects in materials and workmanship for the time periods listed in the chart starting from the date the equipment is placed into service and is for the benefit of the original purchaser: THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WHICH ARE HEREBY EXCLUDED.
TABLE OF CONTENTS WARRANTY STATEMENT xi SPECIFICATIONS 1 FEATURES & OPERATING CONTROLS 2 PRECAUTIONS & GENERAL INFORMATION 4 AGENCY APPROVAL INFORMATION 4 INSTALLATION 5 OPERATION 7 CLEANING INSTRUCTIONS 9 TROUBLESHOOTING SUGGESTIONS 11 SERVICING INSTRUCTIONS 12 EXPLODED VIEW, BREWER 18 EXPLODED VIEW, SATELLITE 21 SERVICE KITS 22 WIRING DIAGRAM 23 Thank You for purchasing this Bloomfield Industries appliance.
FEATURES AND OPERATING CONTROLS BREW HEAD (brew chamber removed) BREWER Model 9102A (model 9104A is similar) POUR-OVER OPENING LD CONTROL PANEL IE MF OO BL BREW HEAD HOT WATER FAUCET ® SPOUT BYPASS NOZZLE ON F OF Y TO AD RE EW BR TIMER ACCESS ER AT HE NK ITCH SW GASKET TA 1/2 L GA 1 L GA ME LU VO CTOR LE SE ER RM H WA ITC SW EW BR H ITC OP ST EW BR SW BREW CHAMBER (IN POSITION) BREWER NAMEPLATE SPRAY DISK WIRE RACK HI-LIMIT RESET ACCESS (9104A) METAL BREW CHAMBER SATELLITE
FEATURES AND OPERATING CONTROLS (continued) Brewer Adjustable Legs Connector Hot Water Faucet Nameplate Allows brewer to be leveled. Also allow clearance for cleaning underneath brewer. Connects to satellite. Allows satellite heater to be energized. Allows brewer to sense that a satellite is in place. Hot water dispensed here. Lists manufacturer, model and serial number. Also lists voltage and wattage rating of brewer. Control Panel Start Brew Switch Press to start a brew.
GENERAL INFORMATION AND PRECAUTIONS This appliance is intended for use in commercial establishments WARNING: only. Electric This appliance is intended to brew hot beverage, specifically coffee, Shock hazard All servicing requiring access to non-insulated electrical components must be performed by a factory authorized technician. DO NOT open any access panel which requires the use of tools. Failure to follow this warning can result in severe electrical shock. for human consumption.
INSTALLATION INSTRUCTIONS INSTALL LEGS The brewer is provided with adjustable legs. Be sure all four legs are securely screwed into the base of the brewer. LEVEL THE UNIT The adjustable legs allow the brewer to be leveled. Set the brewer in its ultimate operating location and check for level with a spirit level Adjust the brewer for level from front-to-rear, and from sideto-side. Be sure all four feet rest firmly on the counter.
INSTALLATION INSTRUCTIONS (continued) ELECTRICIAN’S INSTALLATION INSTRUCTIONS CAUTION: Electric Shock Hazard Brewer must be properly grounded to a reliable earth ground to prevent possible shock hazard. Do not assume a plumbing line will provide such a ground. Electrical shock may cause serious injury. Refer to Electrical Specifications, page 1.
OPERATING INSTRUCTIONS Fig. 5 Control Panel IL1846 BREWING COFFEE Prepare the Brew Basket: Make sure the wire rack is properly installed in the brew chamber. Insert one (1) Bloomfield paper filter into the brew chamber. Make sure the filter is properly supported by the wire rack. Add a measured amount of grounds to the brew basket. Recommendations (may vary, depending on type of coffee and personal taste preferences): To brew 1/2 gallon, use 2.25 oz (64 gm) of coffee To brew 1 gallon, use 4.
OPERATING INSTRUCTIONS (continued) TANK VENT TUBE HOT WATER FAUCET FAUCET SHUT-OFF VALVE BASIN WATER TANK SOLENOID BYPASS BYPASS VALVE (9104A) BREW HEAD TIMER FAUCET WATER HEATING COIL BREW CHAMBER COLD WATER HOT WATER INLET FITTING IL1847-M663 Fig. 7 Water Flow Diagram The BYPASS is an adjustable flow control valve. It is adjusted to taste for 1 and 1-1/2 gallon brews in Model 9104A NOTE: Use of the faucet will not affect the volume of water delivered for a brew.
CLEANING INSTRUCTIONS CLEANING INSTRUCTIONS PROCEDURE: Clean Coffee Brewer CAUTION: Burn Hazard PRECAUTIONS: Turn POWER SWITCH OFF. Allow brewer to cool. FREQUENCY: Daily TOOLS: Mild Detergent, Clean Soft Cloth or Sponge Bristle Brush IMPORTANT: DO NOT use steel wool, sharp objects, or caustic, abrasive or chlorinated cleansers to clean the brewer, brew baskets or satellites. 1. Turn POWER SWITCH OFF. Allow brewer to cool. 2. Remove satellite. 3. Remove and empty brew chamber. 4.
CLEANING INSTRUCTIONS (continued) Brewing and serving temperatures of coffee are extremely hot. Hot coffee will cause serious skin burns. IMPORTANT: DO NOT use steel wool, sharp objects, or caustic, abrasive or chlorinated cleansers to clean the satellites. PROCEDURE: Clean Satellite PRECAUTIONS: Drain Satellite before Cleaning FREQUENCY: Twice Weekly TOOLS: Sight Glass Brush, Sanitizer Soft Clean Cloth, Bucket 1. Remove and drain satellite. 2.
TROUBLESHOOTING SUGGESTIONS SYMPTOM SUGGESTED REMEDY Reconnect brewer to electric power Reset circuit breaker Main power switch off or damaged Check. Turn main power switch on. Replace if needed Brew switch damaged Check. Replace if needed Timer damaged Check. Replace if needed Volume selector switch damaged Check. Replace if needed Tank heat switch off Turn tank heat switch on Hi-limit tripped Allow to cool, reset hi-limit Thermostat out of adjustment or damaged Check.
SERVICING INSTRUCTIONS Disconnect brewer from electric power before opening any access panel. Note position of any wires or hoses before removing them from a panel. Wrench for Faucet Tubing ACCESS PANELS TOP PANEL is attached with two screws at the rear and a lip at the front. TOP REAR PANEL is attached with four screws. BASIN sets in the body. After disconnecting three hoses, it may be lifted out. TIMER ACCESS and HI-LIMIT ACCESS PLUGS may be pried out with a thin flat blade screwdriver.
SERVICING INSTRUCTIONS (continued) TEMPERATURE ADJUSTMENT CAUTION: SHOCK HAZARD PRECAUTIONS: Disconnect brewer from electric power. Allow brewer to cool. FREQUENCY: As required to adjust delivered volume TOOLS: Phillips head screwdriver Live electrical circuits are exposed during this procedure. Use care to avoid uninsulated electrical connectors. Adjustments to be performed by qualified technician only. 1. Press HEATER ON/OFF switch to OFF. Turn POWER switch on back of brewer OFF. 2.
SERVICING INSTRUCTIONS (continued) Adjustments to be performed by qualified technician only. NOTE: Brewer is pre-adjusted to deliver 1/2, 1 and/or 1-1/2 gallons of coffee at a water pressure of 50 p.s.i. Use this procedure to adjust the delivered volume to suit local conditions. BREW TIMER ADJUSTMENT PRECAUTIONS: None FREQUENCY: As required to adjust delivered volume TOOLS: Small flathead screwdriver Satellite or other container to calibrate volume 1. Press TANK HEATER switch to OFF. 3.
SERVICING INSTRUCTIONS (continued) BYPASS ADJUSTMENT (9104A ONLY) PRECAUTIONS: Disconnect brewer from electric power. Allow brewer to cool. FREQUENCY: As required to adjust for change in delivered volume, or to taste. TOOLS: Phillips head screwdriver Stubby flathead screwdriver Provided wire gauge set 1. Press TANK HEATER switch to OFF. Disconnect brewer from electrical power. 2. Remove SATELLITE, BREW CHAMBER, TOP PANEL and BASIN. 3. Turn bypass adjustment screw several turns counterclockwise.
SERVICING INSTRUCTIONS (continued) Deliming chemicals are caustic. Wear appropriate protective gloves and goggles during this procedure. Never siphon deliming chemicals or solutions by mouth. This operation should only be performed by qualified and experienced service personnel. IMPORTANT: DO NOT spill, splash or pour water or deliming solution into or over any internal component other than the inside of the water tank.
SERVICING INSTRUCTIONS (continued) 10. Reinstall tank lid assembly into hot water tank. Make sure the lid gasket is properly in place, then reinstall the holddown clamp. 11. Remove spray disks and gaskets. Rinse both brew heads with clean water. Using a stiff brush, scrub spray disk to remove any lime or calcium build-up. Reinstall gaskets and spray disks. 13. Reconnect brewer to electrical supply . 14. Install the brew chamber without filter paper or grounds. 15.
EXPLODED VIEW: 9102A, 9104A PLUMBING COMPONENTS 25 15 OLD-STYLE 1 17 26 16 27 28 2 29 3 30 4 TUBE, FAUCET SUPPLY 18 5 6 19 7 21 8 31 20 32 22 33 23 9 34 10 11 35 24 38 36 12 37 13 14 39 40 41 TANK ASSEMBLY 44 52 42 53 42 45 46 48 55 54 56 47 57 49 58 59 50 51 60 61 PL663 IL1849 REV.
PARTS LIST: 9102A, 9104A PLUMBING COMPONENTS 663 p/n 2M-76061 Owners Manual Satellite Coffee Brewer Fig No Part No Description Fig No 1 2 DD-75778 HOSE BRADED W/BALL VLV 3 DD-71099 ELBOW 1/4 FPT/HOSE 4 5 2V-70124 VALVE SOLENOID 120V 6 DD-70122 TEE BRS 3/8NPTX7/16-20X7/16-20 7 8 9 10 11 12 13 14 15 16 17 2E-75685 2V-73027 2V-70111 2C-70155 SOLENOID BYPASS 120V STRAINER ‘Y’ PLASTIC W/FT TUBE FORMED INLET ASSY NUT 7/16-20 HEX HD BRASS 2K-70154 2V-76056 DD-71357 FTG UNION 1/4X1/4 TUBE 1/4I
EXPLODED VIEW: 9102A, 9104A ELECTRICAL COMPONENTS 1 9102A 2 3 11 12 13 4 5 14 15 6 16 7 14 17 8 18 9 19 10 20 21 9104A 1 11 12 663 p/n 2M-76061 Owners Manual Satellite Coffee Brewer 22 13 23 5 14 15 16 6 14 17 7 18 25 8 26 19 20 21 PL663 20 IL1850 REV.
PARTS LIST: 9102A, 9104A ELECTRICAL COMPONENTS Fig No. Description WS-86280 2T-47499 2E-70642 2N-70520UL 2V-70124 2P-71309 2E-70709 2E-75685 2K-70215 2E-70353 2C-70175 2I-70152 2A-77260 2E-70411 2J-72671 2E-70435 DD-70031 2E-71308 2N-70091UL T-STAT COTHERM SUBST 851 THERMO HI-LIMIT 120/240V SWITCH TOGGLE ELEM HEATING 120V 1675W VALVE SOLENOID 120V TIMER 3 LEVEL 120V TERM BLOCK 4 POLE SOLENOID BYPASS 120V .
EXPLODED VIEW: 9102A, 9104A CABINET & RELATED COMPONENTS 1 16 2 17 3 18 4 19 5 20 6 21 22 23 7 8 25 26 27 9 10 28 11 12 13 14 15 PL663 22 IL1851 REV.
PARTS LIST: 9102A, 9104A CABINET & RELATED COMPONENTS Fig No Part No Description 2F-76666 FILL PORT ASSY BREWERS PLASTIC 4 D7-71300 PAN BASIN 9102 5 D7-71358 BASIN BODY ASSY 9102 DRWG 1 2 3 9102A 5 9104A 6 9102A 6 9104A 7 8 DD-72485 PLUG HEYCO DOUBLE D BULK MATTE 9 DD-71305 COVER BASE BACK 10 DD-71222 BRKT FAUCET SUPPORT 11 DD-71302 BASE COVER WELD S/A 9102 12 DD-72297 BOTTOM PLATE SUB ASSY 14 2A-70631 LEG BLACK 4X1/4-20 15 WS-3902 TRAY DRIP SS1 16 2B-70466 RACK WI
EXPLODED VIEW (continued) SATELLITE ASSEMBLY 9105SS 1 2 3 4 6 8 23 5 7 22 9 10 21 11 12 13 14 663 p/n 2M-76061 Owners Manual Satellite Coffee Brewer 20 15 16 19 17 18 Model: 9105SS PL663 IL1852 REV.
PARTS LIST: 9102A, 9104A 663 p/n 2M-76061 Owners Manual Satellite Coffee Brewer Fig No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Part No DD-71723 2C-70.
SERVICE KITS FAUCET REPAIR COMPONENTS 2C-72680 Hex Lock Nut 2C-70107 7/16“ Lock Washer 2C-72681 Washer WS-82556 Faucet Assembly LOCKNUT LOCK WASHER WASHER FAUCET ASSY HANDLE RETAINER CLIP SPRING SEAT CUP WS-82682 WS-84804 WS-84870 SOLENOID REPAIR KITS 2E-75685 WS-85218 WS-85219 Handle Seat Cup Faucet Repair Kit (Includes Handle, Seat Cup, Spring, Stem, Pin & Bonnet Retainer Clip Aerator Replacement Kit (Includes O-Ring, Aerator Disk & Aerator Cap Aerator Repair Kit (Includes O-Ring & Aerator Disk) O-RI
663 p/n 2M-76061 Owners Manual Satellite Coffee Brewer WIRING DIAGRAMS 27
663 p/n 2M-76061 Owners Manual Satellite Coffee Brewer NOTES
663 p/n 2M-76061 Owners Manual Satellite Coffee Brewer NOTES
10 Sunnen Drive, St. Louis, MO 63143 telephone: 314-678-6336 fax: 314-781-2714 www.bloomfieldworldwide.