Specifications

658 2M-Z17969 Owners Manual 2121 E-Max Satellite Brewer
14
INSTALLATION INSTRUCTIONS (continued)
IMPORTANT:
Initial set-up must be performed
by a qualied installer or
qualied service technician.
Improper set-up will damage the
brewer and void the warranty.
IMPORTANT:
Complete water line installation
before connecting brewer to
electrical power.
INITIAL SET-UP INSTRUCTIONS
Plumber’s and Electrician’s installation procedures must be
completed before proceeding with the set-up.
Be sure all electrical connections are secure, and that all
plumbing connections are secure and leak-proof.
1. CHECK BREWER FOR PROPER CONFIGURATION
Make sure spray disk gaskets are in place INSIDE of spray
heads.
Make sure spray disks are properly installed.
Check hot water faucet for proper operation and leaks.
Place empty satellites in position.
2. START BREWER OPERATION
When electricity has been connected to the unit, there will be
a momentary ash of the power light. Turn the brewer on by
pressing the POWER key.
The brewer will start to ll the tank. With the proper water
supply the tank should be lled in about 2½ minutes. Once
lled, the heating element will come on until the proper tank
temperature has been reached, (which will take about 20
minutes on 120-Volt models or about 12 minutes on 120/240
Volt models).
3. FINAL CHECKS
After initial heat-up and before brewing, draw water from the
hot water faucet until the inlet solenoid actuates. This will
prevent volume differences to the initial brew caused by
water expansion.
Press SATELLITE WARMER switch on. Brewer will not
operate unless the appropriate SATELLITE WARMER
switch on.