Installation & Operation
14
Installation
Initial Startup
The following is a check-list to be completed by qualied 
personnel  prior  to  turning  on  the  appliance  for  the  rst 
time.
•  Open the manual shut-off valve at the rear of the 
oven.
•  Remove the control panel and combustion covers.
•  Turn the combination valve’s manual shut-off to the 
on position.
•  Turn the selector switch to Cook, and the thermostat 
to 500ºF (260ºC).
The oven main burner lights, and the Oven Ready Light 
comes on. With the main burner on, check the following. 
•  Verify there are no gas leaks, by checking all gas 
connections with a soapy water solution.
•  Verify that the inlet pressure is correct. The inlet 
pressure can be checked at the pressure tap located 
on the combination valve’s inlet side.
•  Verify that the manifold pressure is correct. The 
manifold pressure can be checked at the pressure 
tap located on the manifold.
•  If the above pressure readings are set to the recom-
mended pressure requirements, allow the oven to 
burn-off for 2 hours. If the pressure readings are not 
set correctly, turn off the oven and readjust accord-
ingly.
   WARNING
The break in procedure burns off excess 
oils present in the metals during fabrication. 
Smoke may be produced. Proper ventilation is 
required.
Adjustments associated with initial installation
Each oven, and its component parts, have been thorough-
ly tested and inspected prior to shipment. However, it is 
often necessary to further test or adjust the oven as part 
of a normal and proper installation. These adjustments 
are the responsibility of the installer, or dealer. Since 
these adjustments are not considered defects in mate-
rial or workmanship, they are not covered by the Original 
Equipment Warranty. They include, but are not limited to:
•  calibration of the thermostat
•  adjustment of the doors
•  burner adjustments
•  leveling
•  testing of gas pressure
•  tightening of fasteners.
No installation should be considered complete without 
proper inspection, and if necessary, adjustment by quali-
ed installation or service personnel.










