Repair manual

INTRODUCTION
1-2
Installations outside the U.S.
MT2136G ovens require a 15 amp, 50HZ, 1F,
220Ć240VAC, 3 wire service consisting of L1, neuĆ
tral and ground. See FIGURE 2. Use 90C wire and
size to National Electric or local codes.
MT2136E ovens are available in either 1F or 3F opĆ
tions. Single phase units require a 15 amp, 50 HZ,
240VAC 3 wire service consisting of L1, L2 and
ground. Three phase units require a 15 amp, 50
HZ, 220Ć240 VAC 4 wire service consisting of L1,
L2, L3 and ground. See FIGURE 1. Use 90C wire
and size to National Electric or local codes.
CE approved installations
The MT2136G requires a 15 amp 50Hz, 1F, 230
VAC, 3 wire service consisting of L1, neutral and
ground. Connect exhaust fan connector 1 and 2.
See FIGURE 2. Use 90C wire and size according
to local codes.
NOTE: If the phase and neutral are switched the
control locks out.
The MT2136E requires a 15 amp, 50Hz, 3F, 230
VAC, 5 wire service consisting of L1, L2, L3, neutral
and ground. See FIGURE 2. Use 90C wire and
size according to local codes.
240
s
Connector
1
2
L3
L2
L1
N
Fan
N
L
Blodgett
Connector
2Ć4Ć92
A2
A1
2
1
Relay A
2
1
Air Pressure Regulator
Burner Control Solenoid
MT2136G CE Approved Installations
L1
N
230
OvenSupply
MT2136G - Export Installations
L1
N
220Ć240
OvenSupply
MT2136E - Single Phase Export Installations
MT2136E - Three Phase Export Installations
L1
L2
L3
230
OvenSupply
N
400
400
400
MT2136E - CE Approved Installations
L1
240
OvenSupply
L2
L1
L2
L3
OvenSupply
FIGURE 2