Owner`s manual
Introduction
2
Pre-Startup Requirements
OWNER’S RESPONSIBILITIES
A minimum of 5 to 7 working days are needed
to schedule a start-up procedure.
Before a factory representative, or a factory
trained representative, arrives to perform a start-
up procedure, the owner MUST ALREADY have
satisfied the following requirements:
1. Gas Models: Install ati on of an adequate me-
chanically driven ventilation system for the unit.
The ventilatio n system should replace 80% of
the exhaust vol ume with fresh make up air. The
table below can be used as a guidel ine.
2. Electric supplies installed by a certified profes-
sional.
NOTE: Refer to the Owner’s manual provided
with the oven for electrical specifica-
tions.
3. Gas Models: Gassuppliesinstalledbyacerti-
fied professional.
NOTE: Refer to the Owner’s manual provided
with the oven for gas specifications.
Be sure to size the meter for all gas models as
follows:
U.S. installations
a.) Add the total BTU’ s/hr of all the gas ap-
pliances on the line.
b.) Convert BTU’s to cubic ft/ hr using the for -
mula Cu Ft/Hr = 1000 BTU /Hr.
c.) Size the meter accordingly.
General export and Canadian installations
a.) Add the total M
3
/min of all the appliances
on the line.
b.) Sizethemeteraccordingly.
NOTE: Refer to the Owner’s manual provided with
the oven for additional information on util-
ity installation requirements.
SERVICE AGENCY’S RESPONSIBILITIES
Before performing a start-up procedure, the ser-
vice agency MUST ALREADY have satisfied the
following requirements:
1. Assembly of the oven(s).
NOTE: Refer to the Owner’s manual provided
with the oven for assembly.
2. Conversion of ovens to other types of gas
when required.
Oven
M
d
l
Exhaust Volume -- CFM (M
3
/min) Supply R equirements -- CFM (M
3
/min)
Model
Single Double Trip le Single Double Trip le
MT1828G 400-500
(14-17)
800-1000
(23-28)
1200-1500
(34-43)
320-400
(12-14)
640-800
(18-23)
960-1200
(27-34)
SG2136G o r
MT2136G
400-500
(14-17)
800-1000
(23-28)
1200-1500
(34-43)
320-400
(12-14)
640-800
(18-23)
960-1200
(27-34)
SG3240G o r
MT3240G
800-1000
(23-28)
1200-1600
(34-46)
2000-2400
(57-68)
640-800
(18-23)
960-1280
(27-36)
1600-1920
(46-54)
MT3255G 1000-1400
(28-40)
2000-2800
(57-79)
3000-4100
(85-116)
800-1120
(23-32)
1600-2240
(46-64)
2400-3300
(68-93)
MT3270 1200-1650
(34-47)
2400-3300
(68-93)
3600-5000
(102-142)
960-1320
(27-37)
1920-2640
(54-75)
2880-4000
(82-113)
MG3270 1200-1650
(34-47)
2400-3300
(68-93)
3600-5000
(102-142)
960-1320
(27-37)
1920-2640
(54-75)
2880-4000
(82-113)
MT3855 1000-1400
(28-40)
2400-3300
(68-93)
3600-5000
(102-142)
800-1120
(23-32)
1920-2640
(54-75)
2880-4000
(82-113)
MT3870 1200-1650
(34-47)
2400-3300
(68-93)
3600-5000
(102-142)
960-1320
(27-37)
1920-2640
(54-75)
2880-4000
(82-113)