Instruction Manual
OM-KLS-E       7
Initial Start-Up
Now that the kettle has been installed, you should test it to ensure that the unit is 
operating correctly.
1.  Remove all literature and packing materials from inside and outside of the unit.
2.  Clean out any material which might clog or damage the draw-off (product 
outlet).
3.  Install the draw-off valve (packed separately) by sliding the assembly into the 
tangent and hand-tightening the large stainless steel nut.
4.  Turn on the electrical service to the unit. 
5.  Pour water into the kettle unit it is about six inches deep (150 mm).
6.  Test draw-off valve operation by opening it all the way, then closing it before all 
the water runs out.
7. Following“ToStartKettle”instructionsinthe“Operation”sectionofthis
manual, begin heating the water at the highest thermostat setting. The heating 
indicator light should come on immediately, and heating should continue until 
the water boils.
8. Toshutdowntheunit,turnthethermostatdialto“OFF”.
If the unit functions as described above, it is ready for use. If the unit does not func-
tion as described, contact your local Certified Service Agency.
IMPORTANT
BE SURE ALL OPERATORS READ, 
UNDERSTAND AND FOLLOW THE 
OPERATING INSTRUCTIONS, CAUTIONS, 
AND SAFETY INSTRUCTIONS CONTAINED 
IN THIS MANUAL.
WARNING
AVOID ALL DIRECT CONTACT WITH HOT 
SURFACES.  DIRECT SKIN CONTACT COULD 
RESULT IN SEVERE BURNS.
AVOID ALL DIRECT CONTACT WITH HOT 
FOOD OR WATER IN THE KETTLE. DIRECT 
CONTACT COULD RESULT IN SEVERE BURNS.
WATER LEVEL 
BETWEEN 
LINES
Slide the assembly into the tangent and 
hand-tighten the large stainless steel nut.
Each day, confirm the jacket water level 
by checking the water gauge.