Specifications

Installation
15
Final Check
OVEN OPERATIONAL TESTS
NOTE: Checkstobemadebycustomerorautho-
rized service agent.
Cool Down Mode
j Fanrotationis correct,counterclockwisefrom
inside of the oven
j I f incorrect, switch two incoming supply wires
Steam Mo d e
Turn on STEAM mode and verify (Control Panel
Removed):
j Steam Generator flushes and fills
j Check timer operation in all three positions
1. Settimerto “OFF”position, buzzershould
sound
2. Set timer in position other than “OFF” or
“STAY ON”, timer should count down
3. Set timer in “STAY ON” position, oven
should operate continuously without tim-
er
j Run light (power light) turns on
j Verify proper fan r otation
j Unit produces steam, window fogs, door seal
does not leak
j Quenching system working
Hot Air Mode
Turn to HOT AIR mode and set thermostat to
400_F (204_C) and verify:
j Heat demand light is on
j Oven is heating properly
Combi Mode
Drain steam generator, close drain, turn to Combi
mode, set thermostat to 450_F(232_C) and verify
j Pre -heat thermostat (P3) and thermostat
switchover is operational
j Thermostat switchover between hot air and
steam is functional










