Specifications

Installation
6
Owner’s Responsibilities
Installation responsibilities prior to service
startup inspection
You are entitled to a free start-up inspection ser-
vice by our factory ASAP. Before a factory repre-
sentative arrives t o perform a startup procedure,
the owner must already have satisfied the follow-
ing requirements.
1. Oven(s)areuncrated, stacked(ifapplies)and
put in place.
NOTE: Please refer to Leg Attachment and
Stacking Addendum.
2. The owner/ operator must have the following
plumbingandelectricalrequirementsmetand
installed.
NOTE: An atmospheric drain kit and water
pressure regulator are provided with
the equipment, failure to utilizethis in-
stallation kit (or equipment) will void
warranty.
Five to seven working days are needed to sched-
ule a startup inspection service.
PLUMBING
Water
Buildi ng Water Pressure (min/max) 40 PSI min / 60 PSI max
Water Connection 3/4” Hose Fitting
Water Regulator Setting 35 PSI
Drainage Atmospheric Vented Drain
Drain Connection 2” Copper
Avg Water Drain Temp. Approximately 122_F(50_C)
ELECTRICAL
COS-6 COS -101 COS -101S COS -201 COS-20
9.4kw 18.4kw 18.4kw 36.6kw 61kw
Amp/Line (max)
Volt 3Φ 1Φ Volt 3Φ 1Φ Volt 3Φ 1Φ Volt 3Φ 1Φ Volt 3Φ 1Φ
208 26 N/A 208 52 N/A 208 52 N/A 208 102 N/A 208 170 N/A
240 23 40 240 45 77 240 45 77 240 88 153 240 147 N/A
440 N/A N/A 440 48 N/A 440 80 N/A
480 23 N/A 480 23 N/A 480 44 N/A 480 74 N/A
By Mode
Steam 9kw 18kw 18kw 36kw 45kw
Hot Air 9kw 18kw 18kw 36kw 60kw
Combi 9kw 18kw 18kw 36kw 60kw
Blower Motor
.33 HP/0.4kw .33 HP/0.4kw .33 HP/0.4kw .66 HP/0.8kw .66 HP/0.8kw