Specifications

Installation
6
Owner's Responsibilities
Installation responsibilities prior to service
startup inspection
You are entitled to a free startĆup inspection serĆ
vice by our factory ASAP. Before a factory repreĆ
sentative arrives to perform a startup procedure,
the owner must already have satisfied the followĆ
ing requirements.
1. Oven(s) are uncrated, stacked (if applies) and
put in place.
NOTE: Please refer to Leg Attachment and
Stacking.
Maximum shelf loading - 60 lbs (27.3 Kg)
PLUMBING SPECIFICATIONS - BC14E/AA, BC14G/AA and B14G/AB
Water
Water Pressure 30 PSI (207 kPa) minimum
50 PSI (345 kPa) maximum
Water Connection 3/4" Hose Hot and Cold Water
Water Pressure Regulator Setting BCĆ14E/G - Preset to 30 PSI (207 kPa)
BĆ14G - Preset to 3 PSI (21 kPa)
Minimum Requirements TDS - less than 100 parts per million
Total Hardness - 80Ć120 parts per million
Chlorides - less than 30 parts per million
pH Factor - 7.0Ć8.0
Drainage Atmospheric Vented Drain
Drain Connection 2.00" (50.8mm) Copper
Avg Water Drain Temp. Approximately 160_F (71_C)