Repair manual
BC14G AND BC14E
6 --- 3
42. (ELECTRIC OVENS) -- R202 –Ondemand
steam relay
D
Coil is terminals 13 & 14. Coil is energized
by One shot Steam timer, T3 terminal 2.
D
Coil energized terminals 9 to 5 close / pro-
vides power to R204 relay terminal 9 (pow-
er is by-passed the temperature thermo -
stat).
D
Coil not energied terminals 9 to 1 closed,
normal operation, provides power to P5
Hot Air Thermostat.
43. 203 – Flush / Drain Relay.
D
Coil is terminals 13 & 14. Coil is energized
by Flush Timer terminal 1.
D
Coil energized. Terminals 9 to 5 close.
P ower provided to F ast Fill solenoid. Termi-
nals 10 to 6 close. Power provided to
pump.
D
Coil not energized. Terminals 9 to 5 open.
Terminals 10 to 6 open. Normal operation,
auto flush/drain operation disabled.
44. (GAS OVENS) -- R204 --- Water Fill Relay / Fast
low water fill
D
Coil is terminals 13 & 14. Coil is energized by
Low Level Control , LLC, water level flo at reed
switch
D
Coil energized. Terminals 10 to 6 close.
Provides power to fast fill solenoid. Termi-
nals 3 to 11 open. Prevents power being
supplied to R203 relay, terminal 9
D
Coil not energized. Terminals 10 to 2
closed, normal operation, provides power
to R202 terminal 5
45. (ELECTRIC OVENS) -- R204 --- W a t e r F i l l
Relay / Fast low water fill
D
Coil is terminals 13 & 14. Coil is energized by
Low Level Control , LLC, water level flo at reed
switch
D
Coil energized. Terminals 10 to 6 close.
Provides power to fast fill solenoid. Termi-
nals 3 to 11 open. Prevents power being
supplied to R203 relay, terminal 9
D
Coil not energized. Terminals 10 to 6 are
open (no power to fast fill solenoid) / termi-
nals 9 to 1 are close, power provided to
R201 relay terminals 13 and 9.
46. (GAS OVENS) -- R205 --- S t e a m O v e r r i d e
Relay
D
Coil is terminals 13 &14. Coil is energized
by S1 Mode switch terminal 8 when turned
to the Steam Mode.
D
Coil energized terminals 10 to 6 close, sup-
plies power to T5 Hot Air Duty Cycle SST.
Terminals 9 to 5 close, supplies power to
R204 terminal 9.
D
Coil not energized terminals 9 to 1 closed,
suppli es power to XFMR2 Step Down Trans-
former for the hot air igniti o n moduals.
47. (ELECTRIC OVENS) -- R205 --- S t e a m O v e r -
ride Relay
D
Coil is terminals 13 &14. Coil is energized
by S1 Mode switch terminal 8 when turned
to the Steam Mode.
D
Coil energized terminals 10 to 6 close, sup-
plies power to T5 Hot Air Duty Cycle SST.
Terminals 9 to 5 close, supplies power to
R204 terminal 9.
D
coil not energized terminals 9 to 1 closed,
supplies power to XFMR2 Step Down
Transformer for the hot air ignition modu-
als.
48. R206 --- Drain / Flush D isable relay
D
Coil is terminals 7 & 8. Coil is energized
when oven is turned on.
D
Coil energized. Terminals 2 to 6 opens. Al-
lows no power to Flush Timer, T4, terminal
2.
D
Coil not energized. Terminals 2 to 6 are
closed and allows power to be applied t o
Flush Timer, T4, initiating 90 second flush
/ drain cycle
49. S1 – Mode Selector Switch. Used to select op-
eration mode; “CD” is the Cool Down contacts,
“S” are steam contacts, “H” are Hot Air con-
tacts, “C” are the Combi contacts.
50. S2 – Proximity Door Switch.
51. S5 – Timer. P ower in is on terminals 6 & 7. Termi-
nals 4 to 6 are closed when the timer is set for
continuo us “o n” o r set out to a specifi c time.
When timed out, terminals 4 to 5 close, energiz-
ing the T1 buzzer.