Installation manual
18
IM0001_L2_R_WMv1.3
Figure 10 – Supply Circuit Port
3. Insert the supply circuit conductors through the knockout in the metal housing bracket. Pull enough
wiring through to allow for connection to the knockout and ground terminals.
4. Position the 1-inch fitting in the knockout and secure in place using a metal lock ring.
Figure 11 – Service Wiring Terminals