Instruction Manual

Charge on.
Page 1 2 o f 3 7 Blink IQ 2 0 0
Level 2 AC EVSE Instruction Manual 1 0 / 9 / 2 0 1 9
6 .3 . Insta lla tion Procedure
6 .3 .1 . O pen the Blink Pro duct bo x and lo cate the mo unting bracket.
Figure 2
Mo unting Bracket
6 .3 .2 . Drill ho les in the wall o r mo unting surface fo r the mounting bo lts.
N ote: A reco mmended mounting height is 4 0 inches (1 0 1 6 mm) fro m finish g rade to the
bo tto m o f the mounting bracket.
N ote: Fo llow applicable accessibility requirements for the mo unting po sition. This equipment
sho uld be lo cated at least 1 8 inches (4 6 0 mm) abo ve the flo o r.
6 .3 .3 . Secure the mo unting bracket to the wall o r mo unting surface with appropriate fasteners as
fo llo ws:
Fo r wo o d co nstruction, use