User Manual
Semi
-Cell
Shades
Fabric
Cellular
&
5
INSTALLATION INSTRUCTIONS
Step 1. Check Package Contents
Missing part? Call 800-933-7115
Mounting hardware kit includes the following:
Part Quantity
a Mounting Brackets 2 (for 18” to 36” wide shades)
3 (for 36” to 48” wide shades)
4 (for 48” to 72” wide shades)
5 (for 72” to 96” wide shades)
b 1
1
/
8
” Screws 2 per bracket
c. Hold Down Brackets 2 per shade
d ½” Screws 2 per bracket (for hold downs)
e Handle for Bottom Rail 1 (cordless shades only!)
f Handle for Middle Rail 1 (TDBU cordless shades only!)
[Note: one extra screw of each noted size is included for convenience]
Step 2. Tools Required
Screwdriver, tape measure, pencil, drill, drill bits, step ladder.
Note: use #6 plastic anchors for dry wall or plaster mounting (not included).
Drill Bits: for screws, use a 3/32" drill bit - for wall anchors, use 1/4" drill bit.
Step 3. Bracket Location and Installation
Your shade may be installed either inside the window frame or
outside the window frame.
A mounting bracket should be positioned about 1” to 6” from
each end of the head rail. For wider shades that require 3 or
more brackets, these should be spaced evenly between the two
outermost brackets. Always position the brackets such that there
is no interference with the cords and/or mechanisms inside the
head rail. The procedure outlined below will assure proper bracket
placement.
Attaching the brackets:
The shape of head rails and mounting brackets varies by style of shade.
Lift the head rail into position such that the front edge of each
bracket is under the inner front edge of the head rail. Push the head
rail upward until the flexible tab at the bottom of each bracket snaps
onto the back of the head rail. Check carefully to assure that each
bracket is properly secured.








