Operating instructions

Page 7
SECTION 4: INSTALLATION
4.1 ez Blender Installation
1. Place blender base on a at, clean, dry surface.
2. Make sure plug outlet is available within four feet of the motor base.
3. Plug the unit into a 120 volt receptacle with 15 amp protection. Make
sure switch is turned off befor plugging in. Failure to use a dedicated line
may result in damage to the blender. Lack of adequate power causes
the motor to overheat (which shortens the life of the blender electronics.)
Operating the blender in this manner will void the warranty.
4. Ensure that the blender vents are unobstructed to allow for proper
cooling during use.