Air hAndling unit BlauAir CFH EN uSEr’S MAnuAl
www.blaubergventilatoren.de BlauAir CFh CONTENTS Purpose ................................................................................................................................................................................................ 4 Delivery set ....................................................................................................................................................................................... 4 Designation key ...........................................
BlauAir CFh www.blaubergventilatoren.de All operations described in this manual must be performed by qualified personnel only, properly trained and qualified to install, make electrical connections and maintain ventilation units. Do not attempt to install the product, connect it to the mains, or perform maintenance yourself. This is unsafe and impossible without special knowledge. Disconnect the power supply prior to any operations with the unit.
BlauAir CFh www.blaubergventilatoren.de PURPOSE The air handling unit with heat recovery is designed for integration into central mechanical ventilation systems. The unit is rated for continuous operation. Transported air must not contain any flammable or explosive mixtures, evaporation of chemicals, sticky substances, fibrous materials, coarse dust, soot and oil particles or environments favourable for the formation of hazardous substances (toxic substances, dust, pathogenic germs).
BlauAir CFh www.blaubergventilatoren.de TECHNICAL DATA The unit is designed for indoor or sheltered use. The installation conditions must prevent ingress of atmospheric precipitations and direct solar radiation at the ambient temperatures from -35 °C up to +50 °C. Outdoor unsheltered mounting is allowed provided an extra cover and weather hoods are installed on the air ducts (not included in the delivery set).
BlauAir CFh www.blaubergventilatoren.
BlauAir CFh www.blaubergventilatoren.de INSTALLATION AND SET-UP ALL OPERATIONS DESCRIBED IN THIS USER’S MANUAL MUST BE PERFORMED BY QUALIFIED PERSONNEL ONLY, PROPERLY TRAINED AND QUALIFIED TO INSTALL AND MAINTAIN VENTILATION EQUIPMENT. DO NOT ATTEMPT TO INSTALL THE PRODUCT YOURSELF. IT IS UNSAFE AND IMPOSSIBLE WITHOUT SPECIAL KNOWLEDGE. The units are available in left- and right-hand modifications with the right or left service side. All the assembly units are accessible on the service side.
BlauAir CFh www.blaubergventilatoren.de Condensate drainage The unit is equipped with drain pipes to remove condensed water outside of the unit. U-traps must be connected to the drain pipes. Dimensions of the U-trap must be selected based on air pressure in the section and are stated in the table.
BlauAir CFh www.blaubergventilatoren.de CONNECTION TO POWER MAINS Connection to power mains must be conducted in compliance with the automation user’s manual. TECHNICAL MAINTENANCE OPEN THE UNIT FOR INSPECTION AND SERVICE NOT LESS THAN 2 MINUTES AFTER COMPLETE DE-ENERGIZING OF THE UNIT. THE FANS ROTATION MAY BE STILL PRESENT. IN CASE OF ANY ABNORMAL NOISE, SMELL AND COMPONENT DEFORMATION IMMEDIATELY CUT OFF POWER SUPPLY TO THE UNIT AND CONTACT A SERVICE PROVIDER OR THE UNIT SELLER.
BlauAir CFh www.blaubergventilatoren.de To access the heat exchanger, remove the service panel. Loosen the screws (1) on the retaining clamps (2) using a hexagon wrench. 1 2 Pull the heat exchanger out.
BlauAir CFh www.blaubergventilatoren.de STORAGE AND TRANSPORTATION REGULATIONS • • • • • • • Store the unit in the manufacturer’s original packaging box in a dry closed ventilated premise with temperature range +5...40 ˚С and relative humidity up to 70 %. Storage environment must not contain aggressive vapors and chemical mixtures provoking corrosion, insulation, and sealing deformation. Use suitable hoist machinery for handling and storage operations to prevent possible damage to the unit.
BlauAir CFh www.blaubergventilatoren.de MANUFACTURER’S WARRANTY The product is in compliance with EU norms and standards on low voltage guidelines and electromagnetic compatibility. We hereby declare that the product complies with the provisions of Electromagnetic Compatibility (EMC) Directive 2014/30/EU of the European Parliament and of the Council, Low Voltage Directive (LVD) 2014/35/EU of the European Parliament and of the Council and CE-marking Council Directive 93/68/EEC.
BlauAir CFh www.blaubergventilatoren.
www.blaubergventilatoren.
BlauAir CFh www.blaubergventilatoren.de CERTIFICATE OF ACCEPTANCE Unit Type Air handling unit Model Serial Number Manufacture Date Quality Inspector’s Stamp SELLER INFORMATION Seller Address Phone Number E-mail Purchase Date This is to certify acceptance of the complete unit delivery with the user’s manual. The warranty terms are acknowledged and accepted.
www.blaubergventilatoren.