Specifications
Copyright © 2009, 2010, 2011 Black Box Network Services
724-746-5500 | blackbox.com 16
iCOMPEL Digital Signage - User Guide (V8.1.1)
2.1.1 Creating a Schedule
You need to create at least one Schedule to display content on your iCOMPEL. You can create additional Schedules if
you wish to.
To add a Schedule, follow these steps:
1. From the menu bar, select Schedules, then Manage Schedules.
2. To add a new Schedule click the Add Schedule tab.
3. Type in a name for the Schedule.
4. Enter the date and time for the Schedule to start. This setting is not shown for the first B you create.
5. Select the Layout for the Schedule.
6. Click the Add Schedule button.
Schedule Settings
You can define the following settings for a Schedule:
Schedule Name
A unique name for the Schedule.
Valid From
The date and time to start running this Schedule.
All schedules that are have 'Valid From' less than the current time are eligible to play. Schedules that do not satisfy
Conditional Play are not considered unless all schedules are Conditional Play and no schedule satisfies Conditional Play.
The schedule with the most recent 'Valid From' time will play if it satisfies all conditions.
Valid Until
The Valid Until setting can be:
Superseded. The Schedule will play until a more recent Schedule that satisfies other conditions becomes eligible.
Valid Date. The Schedule will stop on the specified date, and a more eligible Schedule will be selected. If no eligible
Schedule is found, then the current Schedule will continue playing.
A schedule will start on the 'Valid From' time provided there is not another schedule that best matches the conditions. The
Schedule will run until it is either superseded or until a 'Valid Until' time.
Show Layout
The Layout to show when this Schedule is started. You can change this by editing the Schedule.
2.1.2 Schedule entries
A Schedule Entry is a set of one or more actions for the iCOMPEL to perform at specified times. The actions that a
Schedule Entry can specify are displaying a Layout, switching a Screen on or off, switching Audio on or off, or
performing an Advance To command. Schedule Entries repeat over a weekly cycle. A program of Schedule Entries
make up a Schedule.
The first Schedule Entry, which is created automatically whenever you create a new Schedule, is the Default Schedule
Entry, and it does not have a start and end time. The Default Schedule Entry defines the default states for all the possible
actions including which Layout is displayed when no other Schedule Entry is active.
You can use Schedule Entries to create a complex sequence of actions, displaying different Layouts at different times of
the day and different days of the week, switching the display on and off, or repeating actions at specified intervals.