Service manual

SKYJACK, Page 23SJIII Series
Section 5 - Procedures Service and Maintenance
39. Press ENTER to complete date entry (the system will store it).
40. The display will show “Calibrate Load” option.
41. Press the ESC button to exit the “Calibrate Load” option.
42. Remove the jumper wire and re-connect the black wire #14 to the coil removed earlier.
43. Close the hydraulic/electric tray.
NOTE
Continuing partially complete load calibration.
Once a calibration phase has been successfully completed, it is not required to do it again (unless of course
a change to the vehicle such as a replacement sensor requires that calibration be repeated). This is useful if
the calibration procedure is interrupted – the remaining phases can be completed at a later time.
If a calibration phase has been successfully completed, a “REDO” message is displayed:
REDO DYNAMIC: NO
REDO LOADED: NO
REDO EMPTY: NO
If the phase does not need to be repeated, just press ENTER to move on.
If the phase does need to be repeated, press UP or DOWN to change “NO” to “YES” then press ENTER.