Service manual
SKYJACK, Page 10 SJIII Series
Section 5 - ProceduresService and Maintenance
T h e g r e e n L E D i.
will turn on solid.
Results: The switch
is ready for normal
operation.
10. Turn main disconnect switch to ā
ā off
position.
11. Remove jumper wire between #7 and #19 from
terminal block.
12. Reattach all wires #02 to motor contactor.
13. Reinstall any covers that was removed.
14. Remove chock or wheel blocks.
15. Proceed to Test and Verify Tilt Circuit.
Test and Verify Tilt Circuit
Red LED
Green LED
Light Indicators
Set up button is located on this
face next to harness
Operations of Tilt Switch
The following describes the LEDās and what they
indicate.
Green LED
Illuminated whenever both tilt
axes are within the specified
degrees of the zero/ home
learned position.
Flashes when transitioning in
or out of tilt angle limits, but
built in time delay has not fully
occurred.
Red LED
Illuminated whenever tilt on one
or more axes is more than the
specified degrees out from the
zero/ home position.
Green & Red LED
On together, no blinking when
fault detected.
Tilt Circuit Test
1. Refer to section 2 for test tilt sensor procedure.
Red LED
Green LED