Specifications

MRQ300/350V Open-Convertible Installation Instructions
2
92-085 Rev 1 Mar2011
Be sure to follow hardware
manufacturers recommended
procedures.
Other features include optional ¾”
Plywood mounted within the secured
space on the back plate. This option
comes with pre drilled holes and flat
head screws to mount to 4 stand offs (F)
located on inside mounting surface. Also
included on this surface is the integrated
level to assist in true alignment of back
plate during installation and a chassis
grounding stud (G).
F
A
D
C
The back plate is equipped with 6
removable access panels (R) which can
be used for routing solid or metal flex
conduit or data and fiber in the most
optimized placement for your
configuration. Optional panels include
brush strip assembly and RJ45 data pass
through connector.
E
A
J
I
L
After ensuring the back plate has been
properly and completely fastened to the
wall per manufacturers’ instructions, the
next step is to hook in place the side
panels. Start by locating the hooks (J)
(AKA: spring lances) on a side panel (I, U).
Note the smooth surface of the side
panels face away from each other. Fit the
hooks of one panel into the rectangular
cutouts (H) in the back plate. All hooks
must be engaged for proper assembly.
When hooks are all seated through the
openings apply pressure as needed to
seat the side panel fully.
H
K
H