Installation guide

BlackDiamond X8 Series Switches Hardware Installation Guide
59
CHAPTER
6
Installing BlackDiamond X8
Series Modules
This chapter provides instructions to install system modules in the BlackDiamond X8 switch and
includes the following sections:
Installation Order on page 59
Installing Fabric Modules on page 60
Installing Management Modules on page 64
Installing I/O Modules on page 65
I/O Module Blanks on page 67
Initial Management Access on page 69
Installation Order
For an initial system installation, the recommended order for populating the chassis is:
1 Install all fabric modules (FMs).
2 Install all management modules (MMs).
3 Install I/O modules.
Required Tools
You need the following tools and equipment to install modules in a BlackDiamond X8 chassis:
ESD-preventive wrist strap
#2 Phillips screwdriver for the retaining screws on the fan tray and locking screws on management
and I/O modules
5/16-inch flat-tip screwdriver for the retaining screws on the fabric module