Installation guide

Chapter 5: Installing a BlackDiamond X8 Series Chassis
BlackDiamond X8 Series Switches Hardware Installation Guide
50
7 On each side of the chassis, set the pegs on the lifting handles into the mounting holes (Figure 17).
Figure 17: Preparing to Lift the Chassis from the Pallet
CAUTION
Do not use the handles on the fan assemblies to lift the BlackDiamond X8 chassis. The handles and the
fan assemblies are not designed to hold the weight of the chassis.
NOTE
Save all packaging, bolts, and washers, as well as the box and pallet, for future use in the event that the
chassis must be moved to another location or returned to Extreme Networks.
Verify that the following items are included in the shipping carton:
BlackDiamond X8 chassis with installed front shipping cover and MM slot cover
Power cord retainer
Two 19-inch support brackets
Pre-Installation Requirements
In addition to the support brackets that are shipped with the chassis, you need the following tools and
equipment to install a BlackDiamond X8 chassis:
Mid-mount bracket kit (model number 48020, ordered separately from the chassis)
# 2 Phillips screwdriver for attaching the mid-mount brackets to the middle of the chassis sides
Rack-mount screws appropriate for your organization’s rack system, as follows:
- 4 screws to attach each support bracket to the rack
- 12 screws to secure the chassis in the rack
The screw size will vary based on your organization’s rack system; screws are not provided.
BDX_005