User guide

272 DISPLAY CONTENT MANAGER — Installation and User Guide
Section 7 — Schedule Screen
Figure 342. Schedule Copy Destination Dates Selected
5. Click the OK button.
The DCM Console copy confirmation dialog shown in Figure 343 appears
Figure 343. DCM Console Copy Schedule Confirmation Dialog
6. Click the Yes button to copy the currently displayed schedule to the
selected date(s).
WARNING Any schedules that exist for the selected copy destination date(s) will be
overwritten with the copied schedule. The prior schedule for that date can
not be recovered.
As illustrated in Figure 344, the displayed schedule is copied to the selected
dates.