Specifications
24
MULTI-FUNCTION LINE DRIVER
5.3.3 U
SING THE
V.52 BERT T
EST
I
NDEPENDENTLY
The Multi-Function Line Driver can perform its V.52 BERT test independently
of the V.54 loopback tests. This requires two operators: one to initiate and
monitor the test at the local MFLD, and one to do the same at the remote
MFLD. To use the V.52 BERT test by itself, both operators should
simultaneously follow these steps:
1. Move the left-hand top-panel slide switch labeled “BERT” to the “511”
(down) position. This will activate the V.52 BERT test mode and transmit
a 511 test pattern to the other unit. If any errors are present, the
receiving modem’s Error LED will blink sporadically.
NOTE
For this independent test to work properly, the “BERT” switch on both
Multi-Function Line Drivers must be set the same way (that is, moved to
the “511” position for this step and to the “511/E” position for the next
step).
2. If the BERT test indicates no errors are present, move the “BERT” switch
to the “up” position to activate the “511/E” test with periodic errors. If
this test is working properly, the receiving modem’s Error LED will blink
regularly. A successful 511/E test will confirm that the link is in place, and
that the Multi-Function Line Drivers’ built-in 511 generators and
detectors are working properly.