Specifications
T1 CSU/DSU
2
TABLE OF CONTENTS
1.0 Specifications .............................................................................................................4
2.0 Introduction ...............................................................................................................6
2.1 General Information .................................................................................................. 6
2.2 Purpose of this Manual ............................................................................................... 6
2.3 Bantam Jacks ...............................................................................................................6
2.4 Loopback Switches ....................................................................................................... 6
2.4.1 Remote CSU/Aggregate Loopback ................................................................ 7
2.4.2 Remote Channel Loopback ............................................................................. 7
2.4.3 Local Channel Loopback Diagnostic .............................................................. 7
2.4.4 Local Aggregate Loopback .............................................................................. 7
2.5 Network LEDs ............................................................................................................. 7
2.6 Channel LEDs ............................................................................................................. 8
2.7 Rear Panel Controls and Interface Connectors ........................................................ 8
2.8 Channel Interface Connections ................................................................................. 8
2.8.1 Power Connection ............................................................................................ 8
2.8.2 Network Connections ....................................................................................... 8
3.0 Installation .................................................................................................................10
3.1 Introduction .............................................................................................................. 10
3.2 Site Preparation ........................................................................................................ 10
3.3 Installation Procedure .............................................................................................. 10
3.4 Equipment Cabling ................................................................................................... 10
3.4.1 Network Cabling ............................................................................................. 10
3.4.2 DTE Channel Cabling .................................................................................... 10
3.4.3 Power Cabling and Initial Power Up ............................................................. 10
4.0 Operation 11
4.1 Introduction .............................................................................................................. 11
4.1.1 Modify Configuration ..................................................................................... 11
Configuration Worksheet ................................................................................. 12—16
4.1.2 Configuration Tables .............................................................................. 17—19
Appendix A: FCC Documentation Requirements..................................................................20
Appendix B: TELCO Affidavit..............................................................................................21










