Specifications
80
CSU/DSU MS DBU
NOTE
When this test is implemented, the far unit receives an OOS/OOF
message from the network and enters an alarm state.
Figure 12-7. DTE Only Test Diagram.
Test Purpose
The DTE Only test is used for the following purposes:
• Verify integrity of the DTE interface.
• Verify integrity of connection between DTE and CSU/DSU MS DBU.
Interpreting Test Results
A BERT tester must be used to interpret the test results of a DTE Only test.
12.3.4 DTE W
ITH
T
EST
P
ATTERN
The DTE with TP (test pattern) test exercises the internal data paths of the
CSU/DSU. The transmit data is looped back to the receive data at a point close to
the physical network interface. The test pattern is generated using the DSU/CSU’s
internal test-pattern generator. This test can be used to detect deficiencies within
the internal circuitry of the CSU/DSU MS DBU. Figure 12-8 illustrates the
loopback point and the data paths for this test.
Figure 12-8. DTE with Test Pattern.
LOCAL
DSU/CSU
DTE
Rx
Tx
NET Rx
NET Tx
DTE Rx
DTE Tx
Error
Inject
Test Pattern
Generator
Error
Clear
Test Pattern
Detector
LOCAL
DSU/CSU
DTE
RD
TD
TELCO
NET Rx
NET Tx
DTE Rx
DTE Tx










