Technical data

Page 22 of 52
• The customer must be told not to block the room air vent.
• The warranty card is to be completed by the registered engineer who
has commissioned the appliance. This is to validate the warranty. The
card must then be given to the customer for return to the factory.
Final Check List
• Are the Flue & Enclosure sealed to ensure no air can travel around
the sides or back of the enclosure?
• Are all other access holes in the burner tray sealed with metal
tape?
• Is the heat shield fitted?
• Is there room ventilation?
• Has the customer being shown how to operate the appliance?
• Has the customer been shown how to replace the handset and
main appliance batteries?
• Has the commissioning sheet on page 23 been completed?
• GIVE THE BOOKLET TO THE CUSTOMER.
• GIVE THE WARRANTY CARD TO THE CUSTOMER.
If you have any questions, or the fire is not operating correctly, contact
the manufacturer on 01325-327221 before you leave the installation.
If the appliance is not fitted in strict accordance with these
instructions, CVO cannot be held responsible for any damage caused
and reserve the right to charge for any corrective work.










