Technical data

Page 16 of 52
Installing the Enclosure
This fire is supplied with an enclosure and integral burner. The appliance is
supplied with a fully tested and working gas burner. There is no need to
dismantle or adjust the burner. Removal of any connections will result in the
warranty being invalidated.
Great care must be taken when handling the burner to avoid damaging the
remote system.
If using with the optional Gather, dry fit the gather to the enclosure taking note
of where the gather and enclosure overlap. In some installations it may be
possible to insert the gather into the opening and lift up to allow space to slide
the enclosure in. This reduces the need for a very large builders opening.
The original fire opening must
be closed, using bricks / blocks
infill the opening to the
required base of the burner,
the void behind the brickwork
should also be filled; block
work or rubble can be used.
(It is advisable to install a solid
base inside the fire opening to
sit the steel framework to).
See construction
image to calculate
builders opening.
The height is to be reduced and
sealed once the unit has been
fitted.
It is best to dry fit the
Enclosure unit first to ensure
clarity this can ensure a clear
route for the gas.
Note: The front edge of the enclosure must be positioned with the front edge of
the enclosure 1mm out from the finished wall. The enclosure must be
secured to the block work by screws and plugs through the base to ensure it
cannot move. The burner must be secure within the enclosure










