Technical data
Page 17 of 44
The original fire opening must
be closed, using bricks / blocks
infill the opening to the
required base of the burner,
the void behind the brickwork
should also be filled; block
work or rubble can be used.
(It is advisable to install a solid
base inside the fire opening to
sit the steel framework to).
Builders Opening
Height – 1000mm Width –
965mm Depth – 450mm
The height is to be reduced
once the unit has been fitted.
It is best to dry fit the Fire unit
first to ensure clarity this can
ensure a clear route for gas
and electrics.
Note: The front edge of the enclosure must be positioned to be level with the
“finished” edge of the wall making allowance for plaster board and any
finishing. The enclosure must be secured to the block work to ensure it cannot
move. The burner must be secure within the enclosure.
Once the enclosure is fixed in a position, the gather (if required) can be fitted.
Note: If the standard gather is not used, the flue must be connected to the
enclosure in accordance with GAS SAFE and local regulation.
Once the gather has been lined up with the enclosure it must be sealed to the
enclosure by the use of silicone sealer or metal tape to ensure an airtight seal
when fitting the gather. Screw the gather in place from the inside of the
enclosure using the 6 countersunk screws provided.
The gas, electric supply and hard wire switch should now be installed as
instructed. IMPORTANT: If the burner is dismantled or any connections
removed from the remote system the warrant will be invalidated. The fire is full
tested at the factory prior to shipping.










