TO AVOID COSTLY INSTALLATION MISTAKES PLEASE READ THESE
INSTRUCTIONS BEFORE STARTING TO INSTALL THE APPLIANCE. THE
MOST COMMON FAULTS CAUSED DURING INSTALLATION ARE
INCORRECT GAS PRESSURE AND INCORRECT WIRING OF THE MANUAL
WALL SWITCH.
Important Note: Every FIREBREAK is fully built onsite at the CVO factory
prior to being shipped to ensure that all parts fit together correctly. The burner
is given a total of 44 performance checks to ensure it operates correctly and
inline with CE approval. Claims will not be accepted for damage to the fire
during installation.
Important Note: This is a high power appliance and a steady gas supply
within +/- 1mBar of the approved pressure as shown on the data plate must
be maintained at all times. Note: Before starting to install the appliance
ensure the pipe work is suitable to supply a steady gas supply as indicated in
the “Gas Consumption” section of the Technical Data. Gas inlet is via an 8mm
gas line. If the gas line is longer than 1.5mtrs then the gas line should be
increased in diameter to 15mm and possibly larger depending on the length of
gas pipe required.
Natural Gas 1.4 m3/Hour
LPG/Propane 0.8 m3/Hour
Important Note: A gather is supplied as standard with this appliance and it
must be used. To ensure the flame quality and debris does not enter the
enclosure. It is also required to seal the enclosure to a flue liner [if used].
This appliance is supplied as a complete fireplace suite of enclosure of gas fire
burner unit, enclosure with V-Groove shelf. To comply with the approval this
fire must be installed as designed. As this is a large fireplace with heavy stone
parts it will require at least 2 engineers to fit the fireplace.
The Complete assembly of this fireplace suite should be carried out by a
trained Gas Engineer who accepts all responsibility for the complete installation
including the flue system, the enclosure, gas pipe work, gas connections and
electrical connections. To validate the warranty CVO Fire will request the
details of the Engineer who has taken responsibility for the complete
installation and the commissioning results as shown on Page 3.
The enclosure must be installed as intended and ventilation to the burner unit
must be provided. This appliance requires a 240v 3A fused spur next to the