Commissioning Checklist & Results
To validate the Warranty and to help with Technical Issues all sections
of the Commissioning Sheet must be completed and readings recorded.
The complete fireplace must be installed by a Gas safe Engineer.
Installer Name…………………………………………………………………
Installer Company……………………………………………………………
Gas Safe Registration Number……………………………………………
Commissioning Date……………………………………………………………
Item Description Readings/Result Pass/Fail
1 Appliance Enclosure Fitted and sealed
inline with Instructions?
2 Burner Ventilation Provided?
3 Room Ventilation Provided?
4 Gas Pipe Work Compatible with Appliance
Gas Consumption Requirements?
GAS PRESSURE TESTS [Using Test Point within the Appliance Only]
Stage 1 - With Other Gas Appliances in the home OFF
5 Gas Standing Pressure. [Fire Off]
6 Gas Pressure [Fire On Pilot]
7 Gas Pressure [Fire On Full]
Stage 2 - With Other Gas Appliances in the home ON
8 Gas Standing Pressure. [Fire Off]
9 Gas Pressure [Fire On Pilot]
10 Gas Pressure [Fire On Full]
WARNING: If the Appliance fails any of the above tests it must not be used
until the problem with the Gas Pipe Work or Gas Meter have been rectified.
CHIMNEY/FLUE TESTS
11 Flue System Diameter and Length
complies with minimum allowed?
12 Appliance Gather Used?
13 Spillage Test Performed?
14 Flue System Flow Test Performed?
When calling our Technical Team for help or advice please have the
above data available.