
Page 18 of 56
IMAGE 2 & 3
Once in place the gather must be secured with the screws provided.
Then sealed with a high temperature silicone fire cement.
At this stage the electrical mains connections, manual wall switch and the gas
supply connected ready for testing and commissioning.