Instruction manual
Section 3
Installation
3.1 INTRODUCTION
3.2 UNPACKING
3.3 INPUT POWER REQUIREMENTS
3.4 SYSTEM CONFIGURATION
3.5 INSTALLATION
3.6 TEST EQUIPMENT REQUIREMENTS
3.1 Introduction
VSP series power supply is configured, calibrated and tested prior to shipment.
This unit is therefore ready for immediate use upon receipt. The initial physical inspec-
tions should be made to ensure that no damage has been sustained during shipment.
3.2 Unpacking
Inspect the shipping container before accepting it from the carrier. If damage to
the container is evident, remove the instrument from the container and visually inspect
it for damage to the instrument case and parts.
If damage to the instrument is evident, a description of the damage should be
noted on the carrier’s receipt and signed by the driver or carrier agent. Save all shipping
containers and material for inspection.
Forward a report of any damage to the factory or the agent through which the unit
is procured.
Retain the original packing container if subsequent repackaging for return to the
factory were required. Repackaging is straightforward and is essentially the reverse of
the unpacking. Only subassemblies need to be repackaged for reshipment, use the
original containers.
Remove the Source module from its shipping container and inspect for any dam-
age to the front panel and display module. Also check for any optional parts which may
have been ordered by you. If the switch or display is heavily damaged or is broken then
DO NOT switch-ON the instrument.
Check the rear of the instrument for damage to Sockets or Fuse Holders. In-
spect also the POWER-ON switch on the front panel.
6










