User manual
33 
Master/Slave Setup 
Only one power supply has to be configured as a Master. The rest must be configured as Slave. 
Up to 3 units can be configured in total. 
Note: Configure Slave power supplies FIRST, and configure the Master power supply 
LAST. For remote or front panel operation, only control the Master power supply. 
Master/Slave Configuration 
After physically connecting the power supplies for parallel or series operation, power ON the 
power supplies and follow the steps below to configure a power supply as a master or slave. 
1.  From the CONFIG menu, select Online and press . The following will display: 
2.  While Parallel or Series is flashing, use   keys to toggle between the two options.  
Set to Parallel for parallel connection and Series for series connection. 
Online Setup 
 Parallel  Slave Addr…  Off 
- + 
DUT 
+  -  
Figure 3.5 - Master/Slave Series Connection Diagram 










