Operation Manual

Table Of Contents
Commissioning
102
6. Apply RF signal to the BIU BTS port.
7. Check Remote Unit FOR status "Set Gain", "Gain" and "Output Power".
8. Adjust "Set Gain" so that desired output power is achieved.
d. If "Gain" level is lower than "Set Gain" level in the status screen then the system is being over driven
and ALC is limiting the gain of the system. Reduce gain setting to the level displayed in "Set Gain".
Submit change and the review status screen. "Set Gain" and "Gain" levels should now be identical.
Bird VPN Access
Establishing secure VPN access for Bird/DeltaNode will allow for remote monitoring and advanced technical
support. The BGW is designed to communicate directly with the Bird/DeltaNode NOC via cloud access.
VPN Settings
1. Connect laptop to an open port on the DAS switch. Do not connect to the Console port.
2. Log into the BGW at 172.22.0.1.
Login Name: extend”
Password: “admin”
3. Click “Configuration,” see
Figure 114
.
4. Click “External Comm.
Figure 114
3
4
5
6
Certificate Entry
5. Click “Certificate Handling.
6. Click “Browse” next to upload Certificate for Secondary CGW.
Only make setting changes to the Secondary CGW. The Primary CGW is reserved for customer CGW access.