User Manual
4
SHOCKTRACK
INSTALLATIONINSTRUCTIONS
Step2PreparingSurfaceforInstallation:
Removeallloosedebrisandbir ddroppings. Surface
shouldbethoroughlycleanedanddisinfectedusing
BirdBGone’sDisinfectantDISSQ8.
ForSingleSideLedges/Surfaces(i.e.ledgesthat
haveabackwall,window,etc.):
1” –12” Use1RowofShockTrack
13” –24” Use2RowsofShockTrack
25” –36” Use3RowsofShockTrack
ForDoubleSidedLedges/Surfaces(i.e.parapetwalls,etc.),
youwillneedtorunarowoneachsideofthesurface,asclose
totheedgesaspossible.Usethefollowingchartforthe
numberofrows:
1”– 4” Use1RowofShockTrackonEach
Side.
4”– 15” Use2RowsofShockTrackonEach
Side.
16” –28” Use3RowsofShockTrackonEachSide.
Step3:DetermineNumberofRows: