Specifications

43
Reference Checker
The Reference Checker is a new feature that can be used for checking for mismatched point
references. Since the correctness of point references are key aspects in multi-photo projects,
this feature can considerably improve the overall accuracy, quality and robustness of your
projects.
The Reference Checker can optionally run automatically as one of the pre-processing stages
(i.e. before the Processing Dialog appears).
The Reference Checker depends on the Project Marking Quality setting found in the Project
Information dialog. A Project Marking Quality of -1.0 turns the Reference Checker off. A Project
Marking Quality of 1.0 turns the Reference Checker on.
The concept behind the Reference Checker is to check photographs pair wise to determine if
any points appear to be misreferenced or mismatched. There are situations where this cannot
be determined, for instance if a pair of photos has fewer than 9 correctly referenced points
between them.
The Reference Checker has a second stage that runs after Processing is complete. The second
stage of the Reference Checker renames, unreferences, or sets marks to ‘do not use’ if a
problem has been able to be determined. What action the Reference Checker takes depends
on the options set in the Processing dialog box. This second stage does not run if the first stage
did not find any problems or the first stage did not run for some other reason.
The results of the second stage are displayed in the Project Status Report and the message
looks similar to this:
“Problem: Points were automatically unreferenced/renamed/set to ‘do not use’ after processing
because they had residuals larger than the current Project Marking Quality of <p> pixels. <list of
points>
Suggestion: High point marking residuals are a result of mis-marking or inaccurate marking,
mis-referencing and/or poor camera orientation. Review problem points and remark and/or re-
reference where required. “
If problem points have been unreferenced in this stage you may consider reprocessing the
project for maximum accuracy and to see if any other points are identified by the Reference
Checker.
Note: To reverse the changes made by reference checker during processing, use the Undo
Process tool before making any other changes.