Technical data

BD / ED / FD 01/2006 page 8/49
Content
1. SAFETY................................................................................................................ 10
1.1 Legal considerations .........................................................................................................................10
1.2 Structure of the safety instructions....................................................................................................10
1.3 Localization / position of safety labels at the unit..............................................................................12
1.4 Type plate .........................................................................................................................................13
1.5 General safety instructions on installing and operating the incubators BD and heating/drying ovens
ED and FD ........................................................................................................................................13
1.6 Intended use .....................................................................................................................................15
1.6.1 Incubators BD..........................................................................................................................15
1.6.2 Heating/drying ovens ED and FD............................................................................................15
2. WARRANTY......................................................................................................... 15
3. UNIT DESCRIPTION ............................................................................................ 17
3.1 Equipment overview BD/ED/FD........................................................................................................17
4. SCOPE OF DELIVERY, TRANSPORTATION, STORAGE, AND INSTALLATION18
4.1 Unpacking, and checking equipment and scope of delivery.............................................................18
4.2 Advice for safe lifting and transportation...........................................................................................18
4.3 Storage..............................................................................................................................................19
4.4 Location of installation and ambient conditions ................................................................................19
5. INSTALLATION OF THE EQUIPMENT ............................................................... 20
5.1 Electrical connection .........................................................................................................................20
5.2 Connection to a suction plant (optional) ...........................................................................................20
6. START UP............................................................................................................ 21
6.1 Switching on the unit.........................................................................................................................21
6.2 Heating operation display .................................................................................................................21
6.3 Air change .........................................................................................................................................21
7. CONTROLLER SETTING..................................................................................... 22
7.1 Display / entry of temperature set-point (without ramp function) ......................................................22
7.2 Display / entry of temperature set-point (with selected temperature ramp)......................................22
7.3 Time functions: Continuous operation and Timer operation.............................................................23
7.3.1 Switching between Continuous operation and Timer operation .............................................24
7.3.2 Continuous operation ..............................................................................................................24
7.3.3 Timer operation: Setting the tempering time ...........................................................................25
7.4 User level settings.............................................................................................................................26
7.4.1 Temperature unit change between degrees Celsius °C and degrees Fahrenheit °F.............26
7.4.2 Enter a temperature ramp .......................................................................................................27
7.4.3 Chamber addressing ...............................................................................................................27
7.5 General notes....................................................................................................................................28
8. SAFETY DEVICES ............................................................................................... 29
8.1 Temperature safety device class 2 (DIN 12880) ED, FD .................................................................29
8.2 Temperature safety device class 3.1 (DIN 12880) BD (option ED, FD))..........................................30
9. OPTIONS.............................................................................................................. 31
9.1 Disconnectable acoustic over-temperature alarm (option)...............................................................31
9.2 Communication software APT-COM
®
3 DataControlSystem (BD, option ED) .................................32
9.3 Analog output for temperature (option).............................................................................................32
9.4 Additional Pt100 temperature sensor (option BD) ............................................................................32
9.5 Water protected internal socket (option BD).....................................................................................33