Owners manual
E4
-
WM5
-
Y
525
A00
MOUNTING I
N
STRUCTION
created on 06.10.2016 E4-WM5-Y525A00_0 Page 3 of 7 revised on:
Using the provided Bill of Materials on page 1, gather the following items:
Item # Description Qty
1 Lower mounting bracket 1
2 Upper mounting bracket 1
3 Socket Head Cap Screw, M8x1.25, L=30mm 4
4. Install the mounting brackets so they are clamped around the tie rod as shown in Figures 3 and 4.
Make sure the BILSTEIN lettering is facing towards the front of the vehicle. Place one drop of Blue
loctite® on the end of each of the screw threads, then thread the 4 socket head cap screws through
the upper mounting bracket and into the lower mounting bracket. Thread them in just enough to
hold the bracket assembly on the tie rod for now, but loose enough so the bracket can be adjusted
on the tie rod.
5. Using a tape measure, position the Bilstein mounting bracket so that the horizontal distance
between the center of the Bilstein mounting bracket and the center of the OE mounting bracket
attached to the axle is 19 11/32” (491mm). See Figure 11 on page 7.
Figure 4
clamp brackets
around tie rod here
Figure
3