Owners manual
10
TECHNICAL
GUIDE.
FULL SERVICE REBUILD:
A full service rebuild will restore the performance of your shock absorber. This procedure is broken down into 9
sub-steps listed below. Please review the required tools above and complete instructions prior to disassembly. It is
important to perform this procedure in a clean, dry environment to keep contaminants out of the shock internals.
1. Piston Rod Assembly Removal
2. Rod Guide Reseal
3. Piston Wear Band Replacement
4. Rod Guide and Valving Installation
5. Draining the Oil
6. Reservoir Reseal:
a. Disassembly
b. Assembly
7. Filling the Oil
8. Installing the Piston Rod
9. Pressurizing the Shock Absorber
Additional Procedures:
1. Revalving
2. Heim Replacement
3. Rod End Removal and Replacement
4. Changing the Hose
B8 8125 TOOL BOX:
• Nitrogen
• Table Arbor Top Press
• Soft Jaw (Radius or Triangle Inter-
face)
• Schrader
TM
Core Removal Tool
• Large Adjustable Open End Wrench
• 5/8” Round Pry Bar
• Hammer
• Snap Ring Pliers
• 271 Red Loctite
• White Lithium Grease
• Propane Torch
• Tabletop Vise
• Pick Set
• 3mm Socket Head Wrench
• Ratchet with 3/4” Socket
• 7/8” Box Wrench
• Face Spanner Wrench
• Torque Wrench (inch lbs)
• Oil Containment Bucket
WARNING!
Please review complete manual before beginning any disassembly.
!










