Owners manual

10
TECHNICAL
GUIDE.
FULL SERVICE REBUILD:
A full service rebuild will restore the performance of your shock absorber. This procedure is broken down into 9
sub-steps listed below. Please review the required tools above and complete instructions prior to disassembly. It is
important to perform this procedure in a clean, dry environment to keep contaminants out of the shock internals.
1. Piston Rod Assembly Removal
2. Rod Guide Reseal
3. Piston Wear Band Replacement
4. Rod Guide and Valving Installation
5. Draining the Oil
6. Reservoir Reseal:
a. Disassembly
b. Assembly
7. Filling the Oil
8. Installing the Piston Rod
9. Pressurizing the Shock Absorber
Additional Procedures:
1. Revalving
2. Heim Replacement
3. Rod End Removal and Replacement
4. Changing the Hose
B8 8125 TOOL BOX:
Nitrogen
Table Arbor Top Press
Soft Jaw (Radius or Triangle Inter-
face)
Schrader
TM
Core Removal Tool
Large Adjustable Open End Wrench
5/8” Round Pry Bar
Hammer
Snap Ring Pliers
271 Red Loctite
White Lithium Grease
Propane Torch
Tabletop Vise
Pick Set
3mm Socket Head Wrench
Ratchet with 3/4” Socket
7/8” Box Wrench
Face Spanner Wrench
Torque Wrench (inch lbs)
Oil Containment Bucket
WARNING!
Please review complete manual before beginning any disassembly.
!