Installation guide Billi Alpine Sparkling Dual levered slimline tap option
Installation requirements. IMPORTANT: This Billi appliance is to be installed by a licensed trades person in accordance with AS/NZS 3500.1 and AS/NZ 3500.2 and in compliance with applicable state regulatory requirements. For correct operation of this appliance, it is essential to observe the manufacturer’s instructions. The Billi system is recommended to be installed on a safe tray in accordance with AS 3500.4 Clause.
Installation requirements. Chilled Water Module Dimentions Alpine Sparkling Ventilation Clearances Back 255mm 420mm Top Top 410mm Front Note: Shaded area shows minimum ventilation clearance Diagram 3 Diagram 2 Installing the dispenser. Install Dispenser Assembly Determine position of dispenser mounting hole in sinktop or benchtop. Refer to Diagram 4 for clearances allowed and correct assembly. Hole size required is ø22mm. Maximum benchtop thickness is 54mm. 1.
Installation schematic.
Installing underbench module. Install Pressure limiting valve a. Screw pressure limiting valve (PLV) onto water supply tap using thread sealant and PTFE plumbers tape. b. Fit ¼-6mm fitting to outlet of PLV Flush Water Supply Flush water supply pipework before installing the underbench unit by running water from supply tap into a bucket. NOTE: Blockages/ unit malfunction caused by debris are not covered by warranty. Clearances for ventilation and service Take care to observe minimum clearances.
Commissioning. Fill Chiller Module ice bank a. Fit black ice bank fill tube from chiller into water supply PLV fitting. Refer to Diagram 5 b. Turn on water supply tap slightly. After about 15 seconds, water will show in the bottom of the sight glass tube. Watch this level rise as water is fed in. c. Turn water tap off when water level reaches the minimum fill marker. Refer to Diagram 8.
Commissioning Checklist CHECK EACH OF THE FOLLOWING ITEMS: Dispenser mounted securely. Tubing cut to correct lengths and not twisted or kinked. Tubing secured correctly Unit connected to COLD water supply. Water main flushed before connection to unit. Correct air clearances around unit. Power circuit fitted with an RCD – earth leakage protection device. Sawdust cleaned out of cupboard area. Door vents and spacer pads fitted correctly Unit cooling (after initial fill).
Billi Australia Pty Ltd 42 Lucknow Crescent, Thomastown Victoria 3074 Australia Telephone 1800 812 321 Facsimile +61 3 9469 0499 www.billi.com.au Designed and manufactured in Australia. As Billi Australia Pty Ltd has a policy of continual improvement, all details are subject to change without notice. All goods are sold subject to our published terms and conditions. Billi is a registered trademark.