Instructions / Assembly

7
SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Perform the following System
Air Purge Procedure to remove any air that may have been introduced into
the hydraulic system as a result of product shipment and handling. This step is to be completed without any
weight on the jack.
1. Turn release valve counter-clockwise on full turn
to the open position.
3. With a at blade screwdriver, unscrew the oil ll
plug slightly to purge trapped air from system. (For
RUBBER OIL PLUGS Use caution not to tear or
puncture the oil plug.)
2. Rapidly pump the handle 6-8 times. Leave handle
in down position to expose oil ll plug.
4. Turn release valve clockwise to the closed
position.
5. Jack is now ready for use. Check for proper pump
action. (Repeat steps if neccessary).