System Hardware Manual 4 - 1
Installing KSUs Chapter 4
SECTION 1
G
ENERAL
I
NFORMATION This chapter contains the necessary information to help the technician
install the KSUs for the Electra Elite 192 system. The technician should be
familiar with this section before installing any equipment.
SECTION 2
S
ITE PREPARATION
AND MDF/IDF
C
ONSTRUCTION Preinstallation planning is essential. Advanced planning minimizes
installation time, cost, and disruption of the customer business activities.
2.1 Precautionary Information
1. Never install telephone wiring during a lightning storm.
2. Never install telephone jacks in wet locations unless the jack
is specifically designed for wet locations.
3. Never touch uninsulated telephone wires or terminals unless
the telephone line is disconnected at the network interface.
4. Use caution when installing or modifying telephone lines.
2.2 Surveying the Customer Site
In most cases, a survey of the customer site is necessary to
determine the proper placement of the Main Distribution Frame
(MDF), the exact dimensions of the area selected for the MDF,
cabling requirements, and possible Intermediate Distribution Frame
(IDF) locations.
Observe the following warnings during installation
.