Specification
(866) 786-1117 • www.BeyondLEDTechnology.com
9
LED WALL PACK
ZION
TM
2nd Gen
Installation II:
ON
OFF
ON
OFF
1. Turn off the power.
3. Drill mounting holes with an
electric drill.Push the expansion
rubber plug into the mounting hole
on the wall.
5. Connect the L,N and G wires to
the power supply.
7. Fix the fixture with screws
8. Make sure the installation is
complete before turning on
the power switch.
6. Mount the cover of the fixture
4. Lock the bottom shell on the mounting
seat with screws.
2. Use a screwdriver to remove the
screws on both sides and remove
the upper cover of the fixture.










