User guide
9. Installation Instructions:
1) To install bell, first remove the gong using the hex key provided.
2) Use elther of the two sets of mounting holes to allow installation
to 50mm& 60mm pitch mounting boxes.
3a) When mounting on to mounting box use the wiring access slot.
3b) When wall mounting wire in from the top ensuring wiring will not foul the gong.
4) During installation,always ensure that the terminal block is at the top.
5) Refit the gong, always aligning mounting lugs and fasten tightly with the screw provided.
10. Load test
Voltage 24VDC
Duration 48hours
E-Mail:bestarco@ pub.cz.jsinfo.net Http:www.be-star.com
TianAn Industry Park 4/F,Site B ChangZhou New District
6 5
A
APPR.
DIS
CHEC.
DRG NO
BS/TEA01.040B
4 3
Bestar Electronics
2 1
Page:3of 3
3rd angle
projectionDATE
DATE
DATE
A
BFB624B
Bell
B
C
D
E
F
G
H
This print and information there in are proprietary to Bestar Electronics Industry Co., Ltd.
and shall not be used in whole or in part without its written content
B
C
D
E
F
G
H
6 5
BeStar
4 3 2 1
BFB624B
Top
Wiring Diagram
Wiring Access
60
50
--
++
IN OUT
IN OUT
-ve
-ve+ve +ve
程久生
04




