Section 100: Before Installing the UPS
101 Pre-Installation Check
Find the following information. Use the labels on the equipment.
UPS:
kW rating (see UPS model #): __________ kW
AC volts in (range): 200 - 240 VAC (standard)
380 - 415 VAC (optional)
AC volts out (range): 100 - 127 VAC, 200 - 240 VAC (all models)
Frequency: 50/60 Hz. On line, input frequency is the same as output
frequency.
Load equipment:
Combined kW rating: __________ kW
AC voltage(s): __________ VAC and __________ VAC
Frequency: __________ Hz
Utility service available on site (AC input to UPS):
Voltage provided to UPS: __________ VAC
Frequency: __________ Hz
External bypass switch (optional):
Best Power model number: _____________
Break-Before-Make (BBM) or BBM
Make-Before-Break (MBB)? MBB
1.Verify that the total kW rating of the load equipment does not exceed the kW rating of the UPS.
2.Verify that the service panel will supply the proper voltage to the UPS.
NOTE: 480 VAC service may be used if the proper step-down transformer is placed between
the service panel and the UPS. See Table 1, note 4.
3.Find your frequency, UPS input voltage, and UPS output voltage combination in Table 1. Call
Best Power if you do not find your application in the table.
4.Use Table 1 and Table 2 to verify that you have the correct model and type of bypass switch.
5.Verify that the frequency supplied at the service panel (UPS input) matches the frequency
required by the loads.